Skip to content

Construction AP

Every construction invoice is a job-cost entry, not just a bill.

Aequo Build codes subcontractor and supplier invoices to job, phase and cost code, holds payment until the right lien waiver is in, and tracks retainage to release, on top of QuickBooks Online.

Aequo Build from $599/month · Live with QuickBooks Online · Last updated

Construction AP, in brief

Aequo Build is construction accounts payable software that runs alongside QuickBooks Online: job-cost coding, approvals, lien-waiver payment controls, retainage, subcontractor compliance, and approved bills written back to QuickBooks. It is built for general contractors, specialty trade contractors, and developers that keep QuickBooks Online as their accounting system of record. Construction AP differs from general AP in four ways: every invoice must be coded to a job and cost code, subcontractor billing is checked against commitments and change orders, payment depends on lien waivers and compliance documents, and retainage is withheld and released over the life of a job. Aequo Build starts at $599/month. Guides, templates, benchmarks and calculators for construction AP teams are collected in the construction AP knowledge center.

Where construction AP breaks down.

"Invoices keep landing on the wrong job."

A supplier invoice coded to the wrong job or cost code looks fine in QuickBooks until the job report is wrong, the margin on one job looks too good and another too bad, and the project manager stops trusting the numbers.

"We paid a sub before the waiver came in."

Waivers arrive by email, text and post, and nothing stops a payment going out while the conditional waiver for that draw is still missing. If the sub then fails to pay their own supplier, the lien lands on the owner's property and the GC has to clear it.

"Nobody can say how much retainage we are holding."

Retention sits in a spreadsheet per subcontract, so release dates slip, subs chase money they are owed at closeout, and the retainage payable balance on the books never quite matches.

"Field approvals take weeks."

Superintendents and project managers approve from the jobsite, and invoices wait in a truck cab until someone chases them. Meanwhile the sub is calling AP, and the draw deadline is getting closer.

"The sub billed against a change order nobody signed."

Subcontractor pay apps include extra work that was discussed on site but never approved, and AP has no quick way to check billing against the committed contract value.

"Their insurance certificate expired three months ago."

Certificates of insurance, W-9s and waivers are chased by email for every sub on every job, and an expired COI is found only when there is a claim or an audit.

How Aequo Build handles it

From inbox to ledger in 9 steps.

  1. Step 01 · Invoice capture and work queue

    Capture every invoice in one work queue

    Subcontractor pay apps, supplier invoices and equipment rental bills are uploaded and extracted for an operator to review, so nothing waits in a truck cab or a project manager's inbox.

  2. Step 02 · Job-cost coding

    Code to job, phase and cost code

    Each invoice is coded to job, phase, cost code and cost type before approval, with suggestions from that vendor and project history. A concrete supplier that always bills the foundations phase on a job is suggested there the next time.

  3. Step 03 · Commitments, subcontracts, and PO matching

    Check billing against commitments

    Invoices are matched to purchase orders, subcontracts and change orders, so billing is checked against what was committed. A pay app that bills beyond the subcontract and its approved change orders is visible before anyone approves it.

  4. Step 04 · Pay applications

    Track pay apps against the schedule of values

    Each subcontractor pay application is tracked against the schedule of values for the job, so percent complete, amount billed to date and what remains on each line are visible when the project manager reviews the draw.

  5. Step 05 · Approval workflows

    Route to project and finance approvers

    The project manager confirms the work was done and the controller confirms the coding and the amount. Nothing is paid or posted until the right people have approved it.

  6. Step 06 · Lien-waiver payment controls

    Hold payment until the waiver is verified

    Payments made from Aequo Build wait for a reviewer to verify the required conditional waiver, or for an approver to override with a reason. Overdue waiver requests escalate, and the unconditional waiver is requested automatically after payment.

  7. Step 07 · Subcontractor portal and compliance

    Let subs send their own compliance documents

    Subcontractors upload lien waivers, insurance certificates and W-9s through a self-service portal and check their own payment and retention status, so AP is not the go-between for every document and every "has it been paid?" email.

  8. Step 08 · Retainage tracking

    Track retainage to release

    Retention is calculated when each invoice is approved and tracked per vendor and job until it is released, with a release history and a way to reverse a release made in error.

  9. Step 09 · QuickBooks Online sync

    Write approved bills back to QuickBooks

    Vendors, bills and purchase orders import from QuickBooks Online, and approved bills are written back already coded, so the job-cost reports in QuickBooks match what AP approved.

Aequo Build pricing and integrations

From $599/month.

Aequo Build is construction accounts payable software that runs alongside QuickBooks Online: job-cost coding, approvals, lien-waiver payment controls, retainage, subcontractor compliance, and approved bills written back to QuickBooks.

Live integrations
QuickBooks Online
In development (not yet available)
Procore, QuickBooks Desktop
  • Invoice capture and work queue

    Uploaded invoices are extracted for operator review and routed through a single construction AP work queue.

  • Job-cost coding

    Invoices are coded to job, phase, cost code, and cost type before approval, with suggestions from vendor and project history.

  • Commitments, subcontracts, and PO matching

    Invoices are matched against purchase orders, subcontracts, and change orders so billing is checked against what was committed.

  • Approval workflows

    Invoices route to project and finance approvers before anything is paid or posted.

  • Lien-waiver payment controls

    Conditional and unconditional waivers are tracked per vendor and job. Payments made from Aequo Build are held until a reviewer verifies the required waiver or an approver overrides with a reason; overdue requests escalate, and the unconditional waiver is requested automatically after payment.

  • Retainage tracking

    Retention is calculated when invoices are approved and tracked to release per vendor and job, with a release history and reversal of a release made in error.

  • Pay applications

    Pay applications are tracked against the schedule of values for each job.

  • Subcontractor portal and compliance

    Subcontractors upload lien waivers, insurance certificates, and W-9s and check payment and retention status through a self-service portal.

  • Prevailing-wage reporting

    Certified payroll records are kept per job, with WH-347 report generation for public work.

  • WIP reporting

    Work-in-progress reports compare cost and billing by job.

  • QuickBooks Online sync

    Vendors, bills, and purchase orders import from QuickBooks Online, and approved bills are written back.

Watch

Aequo Build walkthrough: from subcontractor invoice to QuickBooks

How a subcontractor invoice is coded to the job, approved, held for its lien waiver and written back to QuickBooks Online as a coded bill.

Guides and tools

Further reading for construction AP teams

Related industries: Real Estate & Property Management · Home Services · Manufacturing

The numbers

What the published benchmarks say

Third-party figures, each linked to the public source that contains it.

$208B

Estimated cost of slow payments to the US construction industry in 2022

Source: Rabbet, 2022

48%

AP leaders naming slow invoice and payment approvals as a top challenge, across industries

Source: Ardent Partners (Payables Place), 2026

19.9%

Share of invoices that need manual exception handling, across industries

Source: Ardent Partners (Payables Place), 2026

$9.90

Average cost to process a single invoice, across industries

Source: Ardent Partners (Payables Place), 2026
Work out your own cost per invoice

Low-friction next step

Email me the construction AP walkthrough

A short walkthrough of how Aequo Build handles construction invoices, to read before you start a trial or book a demo.

We will email a confirmation link first, then send the resource once you confirm. We may follow up with related product guidance.

Construction AP FAQ

Questions buyers ask

How is construction accounts payable different from regular AP?

Construction AP adds job costing, compliance and retention to the usual invoice-to-payment process. Every invoice has to be coded to a job, phase and cost code; subcontractor billing is checked against subcontracts and change orders; payment depends on lien waivers, insurance certificates and W-9s; and retainage is withheld from each payment and released at the end of the job. General AP tools that only code to a GL account miss most of that.

What is the difference between Aequo AP and Aequo Build?

Aequo Build is the construction edition of Aequo. Aequo Build is construction accounts payable software that runs alongside QuickBooks Online: job-cost coding, approvals, lien-waiver payment controls, retainage, subcontractor compliance, and approved bills written back to QuickBooks. Aequo AP is the general accounts payable product for finance teams outside construction. If your invoices need a job, phase and cost code, or your payments depend on lien waivers and retainage, Aequo Build is the right product; if they only need a GL account and an approver, Aequo AP is.

How much does Aequo Build cost?

Aequo Build starts at $599/month. Teams with multiple entities, higher invoice volume or custom rollout needs can book a construction demo to scope pricing. Aequo Build runs alongside QuickBooks Online, so there is no ledger migration to pay for.

Does Aequo Build hold payments until lien waivers are received?

Yes. Conditional and unconditional waivers are tracked per vendor and job. Payments made from Aequo Build are held until a reviewer verifies the required waiver or an approver overrides with a reason, overdue requests escalate, and the unconditional waiver is requested automatically after payment.

How does Aequo Build handle retainage?

Retention is calculated when an invoice is approved and tracked per vendor and job until release. Each release is recorded in a release history, and a release made in error can be reversed, so the retainage balance reflects what you are actually holding.

Can subcontractors upload their own waivers, COIs and W-9s?

Yes. Subcontractors use a self-service portal to upload lien waivers, insurance certificates and W-9s and to check payment and retention status themselves instead of calling AP.

Does Aequo Build support certified payroll and WIP reports?

Yes. Certified payroll records are kept per job with WH-347 report generation for public work, and work-in-progress reports compare cost and billing by job. Pay applications are tracked against the schedule of values for each job.

Which accounting and construction systems does Aequo Build integrate with?

QuickBooks Online is live today. Procore and QuickBooks Desktop integrations are in development and are not yet available. Contractors on Sage 300 CRE, Foundation or Viewpoint should not expect a connector.

How should a contractor evaluate construction AP software?

Test it on a real job: code an invoice to job, phase and cost code; match a subcontractor pay app to its subcontract and a change order; check that payment is blocked while the conditional waiver is missing; confirm retainage is withheld and tracked; and see the coded bill land in your accounting system. Then confirm which systems it actually connects to today, not on a roadmap.

What should construction AP close out at month-end?

Four things: every subcontractor and supplier invoice for the period coded to its job and cost code, retainage payable reconciled per vendor and job, missing lien waivers and expired insurance certificates chased before the next payment run, and a WIP report that compares cost and billing by job. Aequo Build keeps all four in one place, and the construction AP knowledge center has a WIP report template and retainage guides if you are building the process from scratch.

Try it on your own invoices

Run construction AP through Aequo Build.

From $599/month. Live with QuickBooks Online.